Today was what i call 'a busy day' as our task for the day was to pull and install a network cable from piccinini to academy's offices.
This may sound easy but believe me it isn't.Firstly, we started by counting how many meters is required(by rolling th cable), then we tried to pull it throw the network cable pipe that was under ground but the cable could move(was blocked).We then discovered that the pipe along the way was filled with water and some particles of soil causing the cable from passing thru it and for that, a smaller pipe was used to unblock it.Now this bring us back to the fundamental modules we have already done such as maintaining lighting systems and designing electric wire way that a proper planning is required before commencing with any task.What i learned from this modules is that it is not necessary to only plan on the execution of the task but also after the task is been completed for example if a problem occurs after what installing an appliance,how and what should be done thereon,what i am going to need and also to leave a room for unplanned incidents.
However, as we continued to push the cable in,we came across a number of obstacles were one of them was that the cable could not move due to the curving sharply of the network pipe causing the cable not to move.
Furthermore,a trench was digged around the curving area,so that we can cut it and pull the cable from the inside and join the other pieces/half till the head of the cable appears at the end of the network pipe.
No comments:
Post a Comment