Friday, May 29, 2009

May the 28th

I received my tests results we wrote in tuesday and they were good but not good enough, i need to study some more.

However, after lunch we went to the new adventure centre to install new 2 dedicated plugs(Red plugs) for computers, 4-5 other plugs,2 fluorecent light and 2 lever switch.
It was both fun and boring as i am already used to installing plugs and lights but hey, it has to be done!

Tuesday, May 26, 2009

Monday the 25th

Today was just one of those days where there is'nt much to do.However, i walked in the farm area checking for faults till knock time.

Friday, May 22, 2009

Friday the 22nd of May 2009


To day my day was interesting as we digged a lot of trenches to prepar to install a 16mm three phase cable and did a lot of cable joints using the MX- 3 splicing kit. However, it was fun and very tiring but i will get there with time.

Thursday, May 21, 2009